ECCO Safety Group, Leeds

Previous Case Study Next Case Study

When Leeds based ECCO Safety Group had a business need to increase their pallet racking capacity and manufacturing space, they turned to Quickline for the solution. Having worked together previously, the strong relationship that had been developed was an important factor during the tender process.

Quickline stood out further during the process and secured the project thanks to the speed with which the specification was produced as competitors couldn’t match it. Within the space of six weeks, a warehouse design was in place and building had started.

Through collaboration with the customer and understanding their requirements, Quickline proposed a mezzanine floor and extension to the existing pallet racking. Quickline took a flexible approach to the project, understanding the clients needs to remain operational during the installation. To allow this to happen, the build of the mezzanine floor took place through the night. The new racking and mezzanine floor has enabled ECCO to increase their productivity in both manufacturing and warehousing. The racking extension has created an additional 2,000 pallet spaces.

The project was delivered on time and within budget, delighting the customer. An ECCO spokesman said, “working with Quickline has been an absolute pleasure. They have a family feel but professional approach and a willingness to work with the customer”.

Leeds

Visit our offices

Quickline Limited,
Unit 5,
Mariner Court,
Calder Park,
Wakefield,
West Yorkshire
WF4 3FL

Get in Touch...

Trusted accreditations

Sema Logo 2 Sema Logo 1 Construction Line Logo Safe Contractor Logo Chas Logo