MK Components

Quickline was appointed by MK Components to project manage a full warehouse re-vamp which allowed us to showcase our expertise and abilities.

Arrow down to content
MK Components Logo
Client:
MK Components
Date:
February 2016
Location:
Halifax, UK
Tags:
Warehouse Disassembly, Warehouse Flooring, Warehouse Storage
Talk to An Expert Call: 01138800866

The assignment began with strip out and demolition during which time we removed over 200 tons of internal breezeblock walls. We then painted the full portal frame of the building and expertly bricked up all doorways and windows which would no longer be used. Following this we undertook a full overhaul of the office areas which included new ceilings and partitioning, flooring, decoration and electrics. This was a complicated and detailed fit out project which was completed in just 8 weeks.

MK Components warehouse

Related Success Stories

Find below a snapshot of some of the work we have recently undertaken, if you would like to know more about them or perhaps you would like to visit the sites please don’t hesitate to get in touch.

Get a Free Consultation

Optimise Your Warehouse Today!

Talk to An Expert Call: +44 (0) 113 880 0866